Hello Masayuki Sekihara/Friends,
In our landscape we are trying to implement Fiori as Central Hub System.
We are trying one Front end system called F1.
There are 3 backend systems (A1 - Development, B1 - Quality, C1 - Production).
Lets assume GBAPP002 (PO Approval) for all the three systems. In A1 and B1 we are installing for testing. In C1 it is for Productive use.
When a user opens PO approval from Fiori launchpad in F1 system he should only see the production data.
When a developer opens PO approval in Front End system(F1) how to get POs from desired system (Either A1 or B1 or C1).
Regards
Srikanth S